As part of design of new and upgraded facilities, designed n...read more »ew programmable controls. Projects include the following: • Martinez Pumping Station, Orinda Crossroads Pumping Station,Moraga Pumping Station, San Ramon Pumping Station, Lower Orinda Pumping Station « read less
City of Brentwood - Water and Wastewater Facilities Job 9913.00
Design of electrical and control systems for new 10-mgd, $39...read more »-million facility, with complete provisions to support later plant upgrades. Included dual-redundant programmable control systems and plant-wide fiber-optic networks in self-healing configuration. « read less
Power distribution design to refeed an existing irrigation w...read more »ell system, new concession stand and ticket booth, and for a fully lighted soccer field. « read less
Chico State University - Colusa Hall - New Construction Job 9916.00
Power distribution and lighting design for a 16,500-square-f...read more »oot multiuse facility including art gallery, dining areas, and kitchen. The design included use of color wheels, fiber optics, and lighting controllers to simultaneously meet historic requirements and provide aesthetic and functional spaces for modern uses. « read less
U.S. National Park Service - Casa Grande Ruins National Monument Job NP1
Casa Grande at four stories tall, is the largest preserved p...read more »rehistoric (Hohokam) structure in North America. Built in the 14th Century, and abandoned by the mid-1400's. ArcSine performed detailed field investigations, developed a project site plan, and developed a one-line diagram of the site's existing power distribution system. « read less
U.S. National Park Service - Grand Canyon National Park Job NP4
The Grand Canyon was carved by the Colorado River over the l...read more »ast 17 million years. The Canyon measures 277 miles long, up to 18 miles wide, and attains a depth of over a mile. The area was inhabited by Native Americans who built settlements within the Canyon and its many curves. ArcSine provided electrical/fire alarm design for the construction of a 7,600-square-foot climate-controlled museum and storage facility.
« read less
U.S. National Park Service - Lassen Volcanic National Park Job NP5
Lassen Volcanic National Park, started out as two sepa...read more »rate National monuments: Cinder Cone National Monument, and Lassen Peak National Monument. Congress combined the two National parks in 1916 because of the eruption of Lassen Peak in May 1915 and the active volcanic landscape. The park now covers 165 square miles, 106,372 acres are designated as wilderness area. ArcSine performed detailed field investigations of multiple structures on the park headquarters' project site. In addition, electrical utility coordination was performed.
« read less
California State Parks - McArthur-Burney Falls State Park Amphitheater Job SP2
The McArthur-Burney Falls Memorial State Park is located in ...read more »the midst of the Cascade and Modoc mountain regions, surrounded by forest, streams, and Lake Briton. Its center is marked by the magnificent Burney Falls. ArcSine was chosen to design the lighting for the new park amphitheater. The project consisted of a design with programmed lighting controls and multimedia capabilities. « read less
California State Parks - Shasta Courthouse Museum Job SP3
The Shasta Courthouse structure was constructed in 1855. &nb...read more »sp;In 1861 it was remodeled into offices, a courtroom, and a downstairs jail. It remained the courthouse and jail until Shasta County built a bigger courthouse in Redding. ArcSine was contracted to provide power distribution renovation and lighting design for this historical building and museum. The design included a facility-wide networked control system, including automatic dimming. For changing and future exhibits, a felxible lighting system was designed. Fiber optic light sources were used to provide illumination of selected artifacts. « read less
California State Parks - Weaverville Joss House Job SP4
The Weaverville Joss House, a Taoist Temple built in 1874, i...read more »s considered the oldest, continuously used original Chinese house of worship in California. ArcSine designed an upgrade for power distribution and lighting for the Joss House. The lighting system provided for proper lighting levels, lamp and filter selection, and occupancy sensors with automatic dimming. Fiber optic light sources were used to provide illumination of selected artifacts. The design included provisions for future upgrade to a facility-wide lighting controller, as budget allows.
« read less
Electrical and lighting design for new floating complex incl...read more »uding fueling facilities, a retail store, and houseboat service bays. « read less
As part of design of new and upgraded facilities, designed n...read more »ew programmable controls. Projects include the following: • Martinez Pumping Station, Orinda Crossroads Pumping Station,Moraga Pumping Station, San Ramon Pumping Station, Lower Orinda Pumping Station « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.