EBMUD - Point Isabel Treatment Plant - Pumping Station Job 9823.00
Designed new programmable controls and modifications to, and...read more » interfaces with, the District’s distributed control system (DCS) as part of design of new and upgraded facilities. Projects include the following: Point Isabel Treatment Plant/Pump Station “N” consolidation, Pumping Station “Q”, Pumping Station “G”, and Operations Building upgrade. « read less
As part of design of new and upgraded facilities, designed n...read more »ew programmable controls. Projects include the following: • Martinez Pumping Station, Orinda Crossroads Pumping Station,Moraga Pumping Station, San Ramon Pumping Station, Lower Orinda Pumping Station « read less
City of Brentwood - Water and Wastewater Facilities Job 9913.00
Design of electrical and control systems for new 10-mgd, $39...read more »-million facility, with complete provisions to support later plant upgrades. Included dual-redundant programmable control systems and plant-wide fiber-optic networks in self-healing configuration. « read less
Power distribution design to refeed an existing irrigation w...read more »ell system, new concession stand and ticket booth, and for a fully lighted soccer field. « read less
Chico State University - Colusa Hall - New Construction Job 9916.00
Power distribution and lighting design for a 16,500-square-f...read more »oot multiuse facility including art gallery, dining areas, and kitchen. The design included use of color wheels, fiber optics, and lighting controllers to simultaneously meet historic requirements and provide aesthetic and functional spaces for modern uses. « read less
U.S. National Park Service - Whiskeytown National Recreation Area Job NP10
Whiskeytown National Recreation Area is located 8 miles west...read more » of Redding, California. Whiskeytown Lake provides 36 miles of shoreline and 3,200 surface acres for recreation and was dedicated by President John F. Kennedy in 1963. ArcSine performed field investigations and provided electrical and control engineering designs for modifications to multiple wastewater lift stations. « read less
U.S. National Park Service - Lassen Volcanic National Park Job NP5
Lassen Volcanic National Park, started out as two sepa...read more »rate National monuments: Cinder Cone National Monument, and Lassen Peak National Monument. Congress combined the two National parks in 1916 because of the eruption of Lassen Peak in May 1915 and the active volcanic landscape. The park now covers 165 square miles, 106,372 acres are designated as wilderness area. ArcSine performed detailed field investigations of multiple structures on the park headquarters' project site. In addition, electrical utility coordination was performed.
« read less
U.S. National Park Service - Pinnacles National Park Job NP7
Pinnacles National Park is located 10 miles east of Soledad,...read more » California, and was dedicated a National Monument by Theodore Roosevelt in 1908. The Park encompasses 26,606 acres and is a popular destination for rock climbers, hikers, and tourists. ArcSine provided two separate design packages for Pinnacles National Park, which included a site power distribution system associated with housing and power distribution and controls modifications to the existing water distribution system.
« read less
U.S. National Park Service - Santa Rosa Island, Channel Islands National Park Job NP8
Santa Rosa Island is one of five islands in the Channel Isla...read more »nds National Park, located 26 miles off the coast of Southern California. At 53,195 acres, Santa Rosa Island is the second largest island in the Park and is a popular location for camping, snorkeling, kayaking, and bird-watching. ArcSine performed field investigations, prepared Contract Documents, and provided construction support services, analysis, and conceptual design of 60-kilowatt and 30-kilowatt cogeneration systems to feed community center electrical loads, and heat domestic water and a public swimming pool. Included were 11 historic buildings powered primarily by diesel engine generators, with photoelectric and wind-powered backup. The project provided power to the water storage tanks, generator building, four residences, wells, a shop/branding shed, barn, bunk house, and pier.
« read less
California State Parks - Shasta Courthouse Museum Job SP3
The Shasta Courthouse structure was constructed in 1855. &nb...read more »sp;In 1861 it was remodeled into offices, a courtroom, and a downstairs jail. It remained the courthouse and jail until Shasta County built a bigger courthouse in Redding. ArcSine was contracted to provide power distribution renovation and lighting design for this historical building and museum. The design included a facility-wide networked control system, including automatic dimming. For changing and future exhibits, a felxible lighting system was designed. Fiber optic light sources were used to provide illumination of selected artifacts. « read less