Armadillo Techical Institute - Phase 2 Job 2330.00
HVAC system design for an existing 3,500-square-foot buildin...read more »g located in Phoenix, Oregon. The basis of design is split system heat pumps with natural ventilation. « read less
Phoenix High Schooll Tennis Courts Lighting Job 2331.00
Power distribution modification and lighting design fora new...read more » 26,000 square-foot tennis court complex at the Phoenix High School in Phoenix, Oregon. « read less
Power distribution, lighting, and fire alarm system modifcat...read more »ions to accompdate the removal and replacement of the Dunsmuir High School Gymnasiium roof structure, which sustained damage during heavy snowfall in February 2023. « read less
This project included power distribution and mechanical desi...read more »gn for a new 6,700 square-foot walk-in cooler in the Golden Brands Warehouse located in Redding, California. The project comprised of Title 24 documentation, load justification using the 12 month historical peak load data from the Electric Utility, and a field investigation to document existing conditions. « read less
Design/build HVAC systems for the remodel of an approximatel...read more »y 5,000-square-foot former church located in Chiloquin, Oregon, into a courthouse building.
« read less
Power distribution, HVAC, plumbing and lighting design for a...read more » new 4,700-square-foot pre-engineered metal CTE building for the Alsea School District located in Alsea, Oregon. « read less
San Clemente State Beach Combo Building #6 Job 2340.00
This project included MEP design for a new comfort station b...read more »uilding located in San Clemente State Beach, California. The 1,125-square-foot comfort station includes and upgraded ADA pathway and parking.
Key Design items include:
Design of a new electric service for the building
Design of domestic water, sanitary drain, and vent systems
Ventilation load analysis « read less
This project included power distribution, HVAC, lightin...read more »g, and plumbing design for the new contruction of a 4,000-square-foot Veterans Hall in Garberville, California. Project included solar power, solar water heating, fire sprinkler system, a small commercial kitchen, restrooms, and a meerting hall with audio/video systems. « read less
Central Curry School District - Gold Beach and Riley Creek High Schools Job 2343.00
Power distribution, lighting, HVAC and plumbing modification...read more »s to accomodate renovations to the Gold Beach and Riley Creek High Schools in Gold Beach, Oregon. « read less
City of Cloverdale - WTP SCADA Improvements Job 2349.00
Design and programming/integration work to modernize the Cit...read more »y of Cloverdale's Water Treatment Plant (WTP) Supervisory and Data Acquisition (SCADA) Sytem. Improvements consisted of replacing aging workstations and servers, replacing the Plant's primary Modicon Quantum PLC with a Schneider M580 PAC, configured with a redundant hot-standby CPU, and migrating the unlicensed Wonderware supervisory software and historian to AVEVA InTouch software and historian. « read less
Nuclear Medicine Associates - X-Ray Machine Replacement Job 2351.00
Power distribution design for an approximate 740-square-foot...read more » remodel at the Nuclear Medicine Associates building, in Redding, California. The remodel was necessary to accomodate a new, larger X-Ray machine, which is replacing an existing X-Ray machine that has reached the end of its usefull life. Contract documents were prepared which will be suitable for plan check and obtaining comptetitive bids. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.