Design/build HVAC systems for a new 3,950 square-foot buildi...read more »ng. Arcsine performed HVAC load calculations, confirmed equipment sizes and provided drawings suitable for permit. « read less
Crater High School Performing Arts Center Boiler Replacement Job 2220.00
Electrical equipment modifications to accommodate the replac...read more »ement of boiler equipment at the Crater High School Performance Arts Center, field investigation to ascertain existing site conditions, and load calculations.
Equipment to be replaced included boiler, heating water pump, starter for heating water pump, and starter for chilled water pump. « read less
Mechanical, electrical, and plumbing (MEP schematic design u...read more »pgrades to the existing Rogue Concert Bowl, located at the Rogue Community College Redwood Campus. Rogue Community College (RCC) is seeking to upgrade its existing amphitheater to meet ADA requirements and convert it into an operable facility capable of hosting graduation ceremonies and community theatre events.
The deliverables identify overall buildout through select drawings and basis of design documents suitable for a third-party cost estimator to review and prepare a Rough Order of Magnitude (ROM) Construction Cost Estimate. « read less
City of Medford Police Station Generator Job 2223.00
Engineering services to evaluate existing standby generator ...read more »load on the existing City of Medford Police Station Generator, with anticipation of adding loads. Work included investigation and load analysis, 30-day power monitoring and preparation of a load analysis report.
« read less
Redwood Community Services - Mental Health Rehabilitation Centter Job 2225.00
Power distribution, lighting, HVAC system, and plumbing desi...read more »gn for a new 12,0000 square-foot mental health rehabilitation facility located in Ukiah, California. The project includes observation rooms nursing stations, offices, and support spaces.
« read less
HVAC system design for a new 17,000 square-foot office and r...read more »etail building located in Medford, Oregon. The basis of design is packaged rooftop units.
« read less
HVAC system design for an existing 2,320 square-foot buildin...read more »g in Phoenix, Oregon. The basis of design is two split system furnaces in the attic. « read less
44 S. Central Avenue Apartment Complex Job 2229.00
Schematic design (SD) for power distribution and lighting mo...read more »difcations for the historic Palace Hotel (14,000 sq-ft), located at 44 S. Central Avenue in Medford, Oregon, which is being remodeled into an apartment housing building. The remodeled building will provide additional housing to the downtown Medfor area for low-income residents. « read less
Power distribution, lighting, HVAC and plumbing design for t...read more »he remodel of an existing 2.500 square-foot clubhouse building for the Talent Mobile Estates located in Talent, Oregon. The project also included site power distribution to accommodate 90 manufactured home sites and associated roadway lighting design. « read less
Talent Mobile Estates Site Utilities and Street Lighting Job 2231.00
Site utility design, roadway lighting, and street lighting d...read more »esign for a new mobile home estate consisting of 90 manufactured home sites for the Talent Mobile Estates in Talent, Oregon. « read less
This project included power distribution, lighting, HVAC, an...read more »d plumbing design for a new, three-story, 19,77 square-foot, multi-family apartment building in Arcata, CA. The project included design of a roof-mounted photovoltaic solar system.
« read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.