ArcSine provided preliminary mechanical and electrical de...read more »sign for a new 3,000-square-foot processing building at the Linde Electronics facility located in White City, Oregon. The project included preparing concept HVAC, power, lighting, and telephone system design. « read less
Napa County Administration Building - Support Job 1195.00
The 30,000 square-foot District Administration Building and ...read more »Corporation Yard included 12kv, 480-volt and 208-volt electric power; District data center including provisions for both business and plant control computing; fire detection and supression; access control; video; and site infrastructure. « read less
City of Medford - Service Center - SDC Job 1232.00
Provided construction services for the power segregation of ...read more »three City Departments (Public Works, Police, and Water). Construction services included prebid and preconstruction meetings, weekly construction progress meetings, responding to RFI's and change orders, ongoing site visits, and closeout documents and procedures. « read less
HVAC, plumbing and power distribution design for a consol...read more »idated car rental maintenance/wash facility located at the Medford, Oregon municipal airport. « read less
City of Eagle Point - Task Order Contract Job 1270.00
On-call contract for municipality candidate tasks:
Stre...read more »et lighting and supporting electrical
Park lighting retrofit and supporting electrical
Historic bridge lighting
SCADA support (Water Department) « read less
Bear River Band of Rhonerville Rancheria - Casino Addition Job 1315.00
Services provided for a 3,300-square-foot addition to the ex...read more »isting Bear River Casino located in Loleta, California. Addition will be used for gaming (slot machines) and will require standby power, HVAC systems, power distribution, and interior/exterior lighting design. This project also included detailed field investigation work prior to design and construction services. « read less
Egyptian Theatre - Historical Renovation and Marquee Design Job 1325.00
Electrical and lighting design for the construction of two n...read more »ew ADA compliant restrooms on the ground floor for the Egyptian Theater located in Coos Bay, Oregon. « read less
Foothill Water Treatment Plant - Programming Job 1480.01
Provided PLC and SCADA programming and configuration support...read more » for the in-service Foothill Water Treatment Plant located in Redding, California. ArcSine's work included developing detailed control strategies, modifying existing PLC programming for variety of GE PLCs (Fanuc 90-30 and Rx3i), programming of a new GE Rx3i PLC, and Supervisory Control and Data Acquisition (SCADA) improvements on a GE iFix platform. ArcSine's programming staff developed detailed test procedures for both factory and start up testing, and provided complete commissioning support, including training of City Staff. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.