Project Details

  • View Project
  • View Project
  • View Project
  • View Project
  • View Project
  • View Project
  • View Project
  • View Project
  • View Project

City of Portland - Swan Island CSO Pump Station

Job: 0824.00

City: Portland
State: OR
Type of Work:
Type of Facility:
Type of Systems:
File/Sheet: Additional Information Available for Download/Viewing:
Swan_Island_CSO_Pump_Station.pdf 374.4 KB
Details:

Designed electrical power distribution and controls for the sewage pump station, including two 2,000-hp and two 800-hp, 4.16kV sewage pumps with provisions for three additional 2,250-hp pumps. The design included an outdoor substation including 5kV, double-ended switchgear, 480V double-ended switchgear, and 5kV variable-frequency drives. Included integration with City SCADA

HVAC Design Companies In Portland