CCCSD Concord Metering Station Construction Management Job 1738.02
Electrical and instrumentation improvements for a a critical...read more » flow metering station. Included replacing a 30" Ø venturi flowmeter with a 30" Ø magnetic flowmeter. « read less
Dublin San Ramon Services District (DSRSD) DERWA Support Job 1748.00
Dublin-San Ramon Services District (DSRSD) has a partnership...read more » with the East Bay Municipal Services District (DSRSD EBMUD Recycled Water Authority) - "DERWA" to supply recycled water to an East Bay Area customer base. ArcSine provided third-party engineering and programming support for a large DERWA expansion project at the DSRSD Regional Wastewater Treatment Facility in Pleasanton, California. In addition to engineering/programming review, ArcSine also provided PLC and SCADA programming for the integration of the DERWA project. « read less
Paradise Irrigation District - Pump Station Design Job 1750.00
ArcSine designed the electrical and instrumentation controls...read more » elements for a new distribution pump station and a replacement reservoir for the Paradise Irrigation District, located in Magalia, California. « read less
ArcSine provided mechanical and electrical design for the re...read more »model of an existing church building (single-story, 8,500-square-foot) to accommodate the Josephine County Food and Friends meals on wheels program, as well as provide a dining hall. The building includes restrooms, offices, dining room, commercial kitchen, and various utility closets/rooms. « read less
Electrical, I&C construction management for Guam Waterwo...read more »rks Authority's (GWA) SCADA Phase A-1 construction project. Included deep wells, reservoirs, booster pumping stations, sewer pumping stations, and a sewer treatment plan (~20 sites). This project implemented the first phase of what is ultimately envisioned to be an island-wide SCADA network for 400+ sites. « read less
Cloverdale Foothill Pump Station Soft Starter Replacement Job 1831.00
Procured, wired, configured, installed and tested one soft s...read more »tarter at the Foothill Pump Station located in Cloverdale, California. « read less
High school renovation and new construction. Renovatio...read more »n included 56,000 square-feet of theater, gymnasium, kitchen, commons, and supporting spaces. New construction consisted of 80,000 square-feet of class rooms, administration, science/maker space labs, library, offices, elevator, and supporting rooms. Full MEP services plus access control, surveillance, mass notification, and fire alarm/sprinkler performance specifications. Site demolition, utility, and parking lot design were also included. « read less
Jackson County - Scenic Avenue Fire Station Job 1870.00
ArcSine provided complete electrical, mechanical, plumbing, ...read more »and lighting design and construction services for a 10,000-square-foot fire station located in Central Point, Oregon. (Essential Facility) « read less
ArcSine designed plans for the demolition of lighting and el...read more »ectrical systems, plans for new power distribution and grounding systems, and plans for interior and exterior lighting, including site lighting. Additionally, ArcSine provided a site investigation to determine existing electrical distribution and lighting systems prior to design. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.