Performed a comprehensive audit of the the City of Modesto...read more »39;s existing water, wastewater, and storm water SCADA systems, which consisted of proprietary hardware and software developed by HSQ Technologies. City SCADA was comprised of a 20 year-old central computing infrastructure and remote devices at over 200 sites throughout the city. The Audit defined present and future SCADA requirements, and evaluated and decided how to best meet those requirements. ArcSine's Audit developed a roadmap which clearly defined the sequence, timing, costs, staffing and other aspects of the SCADA migration. ArcSine's work products were suitable for planning, budgeting, and usable by technical and managerial personnel. « read less
Electrical engineering support for decommissioning the Humbo...read more »ldt Bay Nuclear Power Plant. Support included electrical design and supporting calculations for phased decommissioning of various elements of the Humboldt Bay Power Plant. « read less
Remodel of a 13,000-square-foot building. Included sit...read more »e investigations, demo drawings, power distribution, lighting design, and a security/access control system, along with a fire alarm performance specification. « read less
Novato Sanitary District - RWF Expansion Job 1617.00
ArcSine designed electrical and control system improvements ...read more »for improvements to the Novato Sanitary District's in-service Recycled Water Facility (RWF) to increase the Plant's capacity from 0.85 MGD to 2.55 MGD. « read less
ArcSine Engineering provided both engineering services durin...read more »g construction and complete PLC and SCADA programming for a major upgrade to increase the capacity of the Novato Sanitary District's primary Recycled Water Facility, located in Novato, California. « read less
ArcSine provided electrical and control system engineering s...read more »upport for water system improvements for the City of Tulelake, California. Improvements included a complete rehabilitation of the Well No. 1 site, the addition of a standby generator at Booster Pump Station No. 1, including an Automatic Transfer Switch (ATS), the addition of a standby generator and ATS at Well No. 3, the addition of an ATS at Lift Station No. 2, and consolidation of the power distribution system at the corporation yard (BPS, Well No. 1, and Lift Station No. 1). « read less
DSRSD - Field Operations Facility-Electrical Improvements SDC/Construction Mgmt Job 1622.01
ArcSine provided engineering services during construction an...read more »d construction management for construction of electrical improvements to the Dublin San Ramon Services District's (DSRSD) operations Facility (FOF) in Pleasanton, CA. The project replaced the existing 1000-Amp service entrance, installed an 80kW emergency standby generator, including an automatic transfer switch (ATS), installed a 30kVA uninterruptable power supply (UPS) to provided redundant power to DSRSD's critical Supervisory and Data Acquisition (SCADA) system, installed a programmable logic controller (PLC) panel which interfaced with the District's 186Hz microwave backbone telemetry system and 4.9 GHz remote site radios, and a building-wide ArcFlash study. « read less
NASA-Ames Research Center is currently undergoing a NASA Con...read more »struction of Facilities (CofF) projects to replace the air-to-tube heat exchanger used to cool the heated gases that exhaust from the Aerodynamic Heating Facility (AHF) Arc Jet. ArcSine work included design, furnishing and installing, and testing electrical and controls integration aspects of the work. « read less
MEP design for the new construction of a 6,500-square-foot b...read more »uilding. Two individually metered tenants - Rogue Credit Union Bank and Post Office/Video store. « read less
MEP design of a two-story 4,000-square-foot addition to an e...read more »xisting 5,500-square-foot home. Facility will be operated by the "Friends of Hospice". Project included the addition of eight new suites with private bathrooms and a two-story elevator. This was the primary residence of Harry Holmes of the Harry & David business. « read less
Red Bluff City Hall - Boiler/Chiller Replacement Job 1634.00
Provided engineering design and bidding assistance services ...read more »necessary for the replacement of the existing Chiller and condenser units (air conditioning), and the Boiler (heating equipment) at the Red Bluff City Hall complex. « read less
Remodel to the existing Carnegie Library located in Lakeport...read more », California. Project added an elevator, new restrooms and entry. Project included MEP services. « read less
Rogue Credit Union - South Admin Expansion Job 1645.00
Power distribution, lighting, plumbing, and HVAC for a core/...read more »shell building for administrative services for Rogue Credit Union. Provided infrastructure for standby generator power to the facility, for owner-selected systems only. « read less
Dublin San Ramon Services District - Lift Station LS1 Radio Path Study Job 1650.00
ArcSine performed field radio testing using a 4.9 Coltz ...read more »;Subscriber module and access point, to verify a suitable radio path to integrate a remote lift station site into the District's SCADA system. The field testing identified the location (site) on the District's 186GHz microwave backbone ring best suited to receive the lift station telemetry. ArcSine's deliverables consisted of a report which include radio test data. « read less