The Holly Theatre was constructed in Medford in 1930 and was...read more » an icon of Medford's downtown district. This stately theater brought families downtown to see the latest films and served as a catalyst for business activity. With an original seating capacity of 1,200, the Holly operated until 1986 when changes in the motion picture industry caused many single-screen movie houses to close. The Holly Theatre building has been recognized as having both national and statewide historic significance and is listed on the National Register of Historic Places. The Holly Theatre was built by noted Medford architect Frank C. Clark at an original cost of $100,000 in a Spanish Colonial Revival style. ArcSine Engineering was hired to provide electrical, mechanical, plumbing, and lighting design services for the restoration of this cherished landmark. « read less
Provided a review and clarification of fire alarm design-bui...read more »ld quotes for the St. Mary's School of Performance and Athletic Center. Provided coordination between multiple contractors to equalize work and quotes. « read less
New construction, mixed-use building in downtown Ashland, Or...read more »egon.
1st floor: Restaurant and wine tasting
2nd floor: Six hotel units
3rd floor: Six condominium units
« read less
Electrical, lighting, mechanical, and plumbing design for th...read more »e Neighborhood Church of Redding, located in Redding, California. The project consists of one Worship Building with infracstructure and provisions for future buildout. The Worship Building is approximately 25,000 square feet, and includs space for a Sanctuary area as well as several rooms for support activities. « read less
Electrical and lighting design for the Karuk Tribal Wellness...read more » Center located in Yreka, California. The building in an 18,000-square-foot facility which will house a gymnasium large enough for a regulation basketball court, a men's and women's locker room, an exercise room, a commercial kitchen, and office spaces. The building is to promote sustainability through energy efficient, environmentally friendly, and universally accessible design which is cost effective. « read less
Plumbing design for tasting room kitchen, banquet kitchen...read more », and wine bar for the Ariel Wine Barn located outside Ashland, Oregon. « read less
Quail Park Memory Care Residences - Plumbing Job 1332.00
Provided engineering services to prepare plumbing drawing...read more »s, suitable for permitting and for construction of the 25,569-quyare-foot Quail park Memory Care facilities in Klamath Falls, Oregon. « read less
Bear River Band of Rhonerville Rancheria - Tish-Non Health and Wellness Center Job 1351.00
Provided MEP design for the new 35,500-square-foot Bear...read more » River Tish-Non Health and Wellness Center in Loleta, California. Work included power distribution, rooftop photovoltaic system, and lighting design. « read less
Engineering services for the design of the electrical, me...read more »chanical, and plumbing systems for the new Cave Junction, Oregon, Post Office Building. « read less
NIC Industries Polymer Design Assistance Job 1372.00
ArcSine provided services to evaluate, design, and assist...read more »e with supervision of construction and commissioning of a proprietary production facility in White City, Oregon.
Project goals included:
Define criteria
Develop a pilot continuous-process manufacturing system
Refine and scale-up to construct continuous-process manufacturing facilities
Recover ammonia to the extent practical/desired
Identify patent opportunities, and develop documentation in support of them
« read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.