Siskiyou Community Health Center-Second Floor Improvements Job 2308.00
Mechanical, electrical, and plumbing (MEP design modificatio...read more »ns to support a tenant improvement at the Siskiyou Community Health Center (SCHC) building located in Grants Pass, Oregon.
Work included HVAC calculations, HVAC ductwork modifications, design of plumbing, drainage, and vent piping for new sinks in exam rooms. Power distribution and lighting demolition drawings, improvement drawings for receptacle and data outlets, improvement drawings for lighting and controls. « read less
THis project included updating eleven educational spaces at ...read more »Mt. Shasta High School to modernize their facility. Mechanical, elecltrical, and plumbing includes new power distribution for five of the spaces, relocation of condensing units, new plumbing and modification, new HVAC, and complete MEP redesign for the boy's and girl's bathrooms, locker rooms, and shower facilities in the gym. « read less
This project included updating three educational spaces at W...read more »eed High School to modernize their facility. Mechanical, electrical, and plumbing includes new power distribution for one space, new plumbing and modifications, and new and redesigned HVAC for the multi-purpose room. « read less
This project included power distribution and mechanical desi...read more »gn for a new 6,700 square-foot walk-in cooler in the Golden Brands Warehouse located in Redding, California. The project comprised of Title 24 documentation, load justification using the 12 month historical peak load data from the Electric Utility, and a field investigation to document existing conditions. « read less
Power distribution, HVAC, plumbing and lighting design for a...read more » new 4,700-square-foot pre-engineered metal CTE building for the Alsea School District located in Alsea, Oregon. « read less
San Clemente State Beach Combo Building #6 Job 2340.00
This project included MEP design for a new comfort station b...read more »uilding located in San Clemente State Beach, California. The 1,125-square-foot comfort station includes and upgraded ADA pathway and parking.
Key Design items include:
Design of a new electric service for the building
Design of domestic water, sanitary drain, and vent systems
Ventilation load analysis « read less
This project included power distribution, HVAC, lightin...read more »g, and plumbing design for the new contruction of a 4,000-square-foot Veterans Hall in Garberville, California. Project included solar power, solar water heating, fire sprinkler system, a small commercial kitchen, restrooms, and a meerting hall with audio/video systems. « read less
Power distribution, lighting, HVAC, and plumbing design for ...read more »the new outdoor learning center of the Children's Museum of Southern Oregon. The project includes an outdoor classroom area, restrooms, and a storage area.
« read less
Southern Oregon University - Central Hall Basement Job 2354.00
The project includes power distribution, lighting, HVAC, and...read more » plumbing design for the basement remodel of Central Hall on the campus of Southern Oregon University in Ashland, Oregon. Also included: improvement design to an existing 14,000 square-foot basement to accomodate one classroom, 29 offices, two bathrooms, and 24 micellaneous rooms for the ROTC, USEM, DR, and UCAM. « read less
Southern Oregon University - Softball Complex Upgrades Job 2403.00
Design of power distribution system modification, site light...read more »ing, new HVAC systems, and new plumbing systems to support the replacement of the Southern Oregon University softball complex. The project includes multiple new buildings, including restrooms, concessions, a press box, gathering area, and more. « read less
The project includes power distribution, lighting, HVAC, and...read more » plumbing design for the renovation of the BLM office in Susanville, California. The project includes field investigation activities, selective salvagin of existing equipment, and selective demolition activities within the renovation area. The project also includes design to support the installation of a new separate warehouse building on the project site. « read less
ArcSine Engineering was the lead consultant on evaluation an...read more »d design of replacement electrical systems for the 700-million-gallons-per-day influent pumping station at the Sacramento Regional Wastewater Treatment Plant. The project included a new 32 MVA substation and 4kV motor control centers, feeding 17,500 horsepower of load. Systems are fully redundant and serviceable. New equipment is housed in a 4,050-square-foot building, fully integrated with site plumbing, HVAC, communications, fire protection, and alarm systems. Building and landscape architecture complement surrounding facilities. The design also included use-change of the existing 1,400-square-foot switchgear room to provide office infrastructure. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.