Developed three upgrade options and ultimate design of the c...read more »hosen options for the Gibraltar Pump Station. Also conducted field investigation and coordination with the electric utility for shutdowns to determine actual capacity of the existing switchgear and utility feeder bussing. Design work required to provide for future additions. « read less
ArcSine provided design of power distribution, backup genera...read more »tor system, and lighting for a 4-story rustic lodge. Included a commercial kitchen, bar, dining room, banquet room, game room, laundry room, large wine cellar, outdoor dining, and 24 individual guest suites. « read less
As part of design of new and upgraded facilities, designed n...read more »ew programmable controls. Projects include the following: • Martinez Pumping Station, Orinda Crossroads Pumping Station,Moraga Pumping Station, San Ramon Pumping Station, Lower Orinda Pumping Station « read less
Power distribution and parking lot lighting design for a com...read more »plex that includes an 11,600-square-foot sanctuary and five modular buildings. This facility required power infrastructure for architectural lighting, theatrical lighting, video distribution, and segregated power for audio distribution and other sensitive electronic equipment. « read less
Renovation design for a two-story, 8,300-square-foot buildin...read more »g originally constructed in 1911. The design included selecting lighting fixtures which were complimentary to the historical character of the building, and submission and approval of the approach by the Historic Preservation Committee overseeing the facility. Power distribution and lighting design for 2,100-square-fee of public area. Services included electrical, mechanical, programming, lighting, power distribution, construction services, water/wastewater, fire/intrusion, and utility coordination.
« read less
City of Portland - Swan Island CSO Pump Station Job 0824.00
Designed electrical power distribution and controls for the ...read more »sewage pump station, including two 2,000-hp and two 800-hp, 4.16kV sewage pumps with provisions for three additional 2,250-hp pumps. The design included an outdoor substation including 5kV, double-ended switchgear, 480V double-ended switchgear, and 5kV variable-frequency drives. Included integration with City SCADA « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.