Design of mechanical, electrical, plumbing (MEP), and lighti...read more »ng for a 14,500-square-foot two-story day-use Alzheimer’s center. « read less
Solano Community College - Building 1400A Job 0640.00
This project consisted of power distribution and lighting de...read more »sign for modernization of a 31,000-square-foot Student Union Building (Building 1400A). The design effort also included the addition of a 2,000-square-foot dining room/command center. This project included the following design items: Coordinate with on-site campus-owned fiber optic systems for telephone/data/fire/intrusion; design of MDF and IDF distribution equipment; fire alarm coordination; complete lighting redesign utilizing energy-efficient fixtures including T5 lamps; lighting control system utilizing Lutron’s ECO-System for campus integration. « read less
Solano Community College - Building 1700A Job 0643.00
Power distribution and lighting design for the modernization...read more » of a 47,000-square-foot gymnasium building. Design included the following:New service entrance. New scoreboard/time clock. New bleacher motors/backstop motors. Design of energy-efficient lighting utilizing T5 lamps. Lutron ECO-System lighting controls. Design of IDF distribution equipment. Coordination of fire alarm design. Design extension of campus-owned 12kV distribution and fiber optic (telephone/data/fire). « read less
Solano Community College - Building 1700B Job 0645.00
Power distribution and lighting design for the construction ...read more »of a new 8,000-square-foot adaptive Physical Education Building. Design included the following: Design extension of campus-owned 12kV distribution and fiber optic (telephone/data/fire).Design of IDF distribution equipment. Fire alarm coordination. Lutron ECO-System for lighting controls. Parking lot/site lighting. « read less
Field investigation and design of electrical and lighting fo...read more »r a 50,000-square-foot historical building. Prepared design documents to implement four hotel suites in an unimproved area for the first floor consisting of 1,800 square feet. In addition, the entire second floor was remodeled to add an elevator, accommodate 12 hotel rooms, laundry room, conference room, and a large assembly room. « read less
Solano Community College - Building 1800A Job 0652.00
Power distribution and lighting design for the modernization...read more » of a 10,000-square-foot vocational education building. Design included the following: Design extension of campus-owned 12kV distribution. New service entrance. Lutron ECO-System lighting controls. Design of IDF distribution equipment. Coordination of fire alarm design. Design of energy-efficient lighting utilizing T5 lamps. « read less
U.S. Cellular Sports Park - Phases II & III Job 0703.00
Power distribution and lighting design for a sports complex ...read more »which consisted of the following: Phase 2: Design-build of a five-field baseball complex centered around a two-story snackbar/scorekeepers building. Phase 3: Complete power distribution and lighting design for four soccer/football fields and one baseball field. All sports field lighting utilized Musco lights. Site also includes a restroom/concession building. « read less