Provided electrical, mechanical, plumbing, and lighting desi...read more »gn for the McKinleyville Teen Center, an approximate 7,000 square-foot addition to the existing McKinleyville Community Center. « read less
ArcSine Engineering’s MEP Revit design services includ...read more »ed:
Power Distribution
· A 1,400 amp 480/277-volt service entrance and power distribution.
· A 500KW standby generator and segregated power distribution system, with multiple fuel sources.
· A 100kVA uninterruptible power supply for building-wide critical loads.
Mechanical/Plumbing Design
· Variable Air Volume (VAV) HVAC system with a 120-ton rooftop unit.
· Redundant ductless split systems to serve critical data/server rooms.
· Heating hot water system consisting of two modulating condensing boilers with variable speed primary/secondary pumping piped to reheat coils at the VAV boxes.
· Plumbing systems, including water, waste, vent, compressed air, parking structure drains, and roof drains.
Lighting Design
· LED general lighting.
· Exit, emergency, and egress lighting meeting NFPA Fire and Life Safety requirements.
· Site lighting.
Other
· Building-wide intrusion, access control, and video.
· Building-wide networking.
· Wireless access points throughout the building.
· Extensive security and specialty provisions.
· Fire alarm system and sprinkler system.
· Central Vacuum System
· Mechanical, electrical, and plumbing designs were coordinated to meet LEED Silver objectives.
« read less
ArcSine, working as a subconsultant to West Yost & Assoc...read more »iates, designed comprehensive upgrades to the Tulelake WWTP in Tulelake, California. Improvements consisted of new pumping systems for the influent and effluent pump stations, including new controls. Replacement of across-the-line aeration blowers with VFD-controlled blowers. Motorized gates for flow coordination, new weather station and data logger, new alarm auto dialer, and replacement of the standby generator system. « read less
Jackson County District Attorney's Office Building Job 1504.00
Electrical, lighting, and mechanical (HVAC and plumbing) des...read more »ign for an approximately 20,000-square-foot office building for the District Attorney's Office, located in Medford, Oregon. « read less
Electrical, lighting, and mechanical (HVAC and plumbing) des...read more »ign for a 5,200-square-foot court house located in Central Point, Oregon. « read less
Bear River Band of Rhonerville Rancheria - Recreation Center, Phase 2 Job 1506.00
Power distribution, lighting design, HVAC, and plumbing desi...read more »gn for the construction of a new 23,700-square-foot two-story recreation center, located in Loleta, California. « read less
City of Medford Fire Stations 2, 3, and 4 Job 1516.00
Design of MEP systems for three new fire stations:
Station ...read more »#2: 10,000-square-feet
Station #3: 12,000-square-feet
Station #4: 12,000-square-feet « read less
Einstein Bagels - Southern Oregon University Job 1549.00
Tenant Improvement to an existing Subway Restaurant space to...read more » convert into an Einstein Bagel outlet. The space is located in the Southern Oregon University Stevenson Building Food Court. Provided MEP services. « read less
ArcSine provided electrical and lighting design for a new so...read more »ftball field at the Bear River Recreation Center located in Loleta, California. The project included field lighting, pathway lighting and a two-story building containing a snack bar, restrooms, announcer room, and storage buildings. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.