ArcSine Engineering’s MEP Revit design services includ...read more »ed:
Power Distribution
· A 1,400 amp 480/277-volt service entrance and power distribution.
· A 500KW standby generator and segregated power distribution system, with multiple fuel sources.
· A 100kVA uninterruptible power supply for building-wide critical loads.
Mechanical/Plumbing Design
· Variable Air Volume (VAV) HVAC system with a 120-ton rooftop unit.
· Redundant ductless split systems to serve critical data/server rooms.
· Heating hot water system consisting of two modulating condensing boilers with variable speed primary/secondary pumping piped to reheat coils at the VAV boxes.
· Plumbing systems, including water, waste, vent, compressed air, parking structure drains, and roof drains.
Lighting Design
· LED general lighting.
· Exit, emergency, and egress lighting meeting NFPA Fire and Life Safety requirements.
· Site lighting.
Other
· Building-wide intrusion, access control, and video.
· Building-wide networking.
· Wireless access points throughout the building.
· Extensive security and specialty provisions.
· Fire alarm system and sprinkler system.
· Central Vacuum System
· Mechanical, electrical, and plumbing designs were coordinated to meet LEED Silver objectives.
« read less
Electrical power system review for a historical visitor'...read more »s center (1934 construction) in the Prairie Creek Redwood National Forest. « read less
ArcSine, working as a subconsultant to West Yost & Assoc...read more »iates, designed comprehensive upgrades to the Tulelake WWTP in Tulelake, California. Improvements consisted of new pumping systems for the influent and effluent pump stations, including new controls. Replacement of across-the-line aeration blowers with VFD-controlled blowers. Motorized gates for flow coordination, new weather station and data logger, new alarm auto dialer, and replacement of the standby generator system. « read less
Water system improvement project intended to segregate priva...read more »te Special Use Permit (SUP) holders from the water distribution system operated by the US Forest Services (including two well sites, a storage tank, and distribution piping) serving two Forest Service campgrounds. « read less
City of Redding - Foothill Water Treatment Plan Improvements Job 1480.00
This project designed improvements to an essential in-servic...read more »e water treatment plan in the City of Redding, California. Improvements included electrical and instrumentation/controls modifications to support: individual filter from monitory and control for each of four filters; the addition of a Filter-to-Waste System; and the construction of a second spent washwater equalization basin. « read less
Electrical, lighting, and mechanical design for new construc...read more »tion of the 3,500-square-foot Rogue Credit Union, located in Roseburg, Oregon. « read less
Jackson County District Attorney's Office Building Job 1504.00
Electrical, lighting, and mechanical (HVAC and plumbing) des...read more »ign for an approximately 20,000-square-foot office building for the District Attorney's Office, located in Medford, Oregon. « read less
Electrical, lighting, and mechanical (HVAC and plumbing) des...read more »ign for a 5,200-square-foot court house located in Central Point, Oregon. « read less
Bear River Band of Rhonerville Rancheria - Recreation Center, Phase 2 Job 1506.00
Power distribution, lighting design, HVAC, and plumbing desi...read more »gn for the construction of a new 23,700-square-foot two-story recreation center, located in Loleta, California. « read less
Yuba City Wastewater Treatment Facility Improvements Job 1512.00
On-call task order contract for ongoing engineering support ...read more »at an in-service wastewater treatment facility. Work included design of: high purity oxygen generation system, new secondary clarifier, rehabilitation of three existing clarifiers, new digested sludge dewatering facility, and a facility-wide evaluation of electrical power distribution and instrumentation/controls systems. « read less
City of Medford Fire Stations 2, 3, and 4 Job 1516.00
Design of MEP systems for three new fire stations:
Station ...read more »#2: 10,000-square-feet
Station #3: 12,000-square-feet
Station #4: 12,000-square-feet « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.