Solano Community College - Building 1800A Job 0652.00
Power distribution and lighting design for the modernization...read more » of a 10,000-square-foot vocational education building. Design included the following: Design extension of campus-owned 12kV distribution. New service entrance. Lutron ECO-System lighting controls. Design of IDF distribution equipment. Coordination of fire alarm design. Design of energy-efficient lighting utilizing T5 lamps. « read less
U.S. Cellular Sports Park - Phases II & III Job 0703.00
Power distribution and lighting design for a sports complex ...read more »which consisted of the following: Phase 2: Design-build of a five-field baseball complex centered around a two-story snackbar/scorekeepers building. Phase 3: Complete power distribution and lighting design for four soccer/football fields and one baseball field. All sports field lighting utilized Musco lights. Site also includes a restroom/concession building. « read less
Designed a 4-MVA transmission class substation with a downst...read more »ream overhead 12kV distribution circuit. Also included site power, lighting, and monitoring and controls. « read less
ArcSine Engineering was sole-sourced to provide electrica...read more »l engineering documents for a renewable energy demonstration system showcasing renewable energy usage, along with serving as a functional power source for Turtle Bay, a recreational facility, located in Redding, California. The photovoltaic system included 18 photovoltaic panels arranged in three arrays, a 3,800-watt inverter, connection to an existing 600-amp switchboard, and coordination with Redding Electric Utility for remote bi-directional net metering. The design also included an observation cabinet where the inverter was enclosed, and the display was viewed through a window for educational purposes. « read less
Iron Mountain Mine - SCADA PLC Upgrade Job 0724.00
ArcSine Engineering was contracted to update and replace the...read more » existing SCADA software and PLCs for the wastewater treatment plant. This plant is part of the Environmental Protection Agency’s Superfund site’s effluent contamination mitigation process. The goal of this project was to reduce the risk of potential discharge of highly contaminated heavy metal leachate into the upper Sacramento River. The site’s SCADA system monitors and controls all aspects of the leachate treatment process, including regulating the release of treated water into the river. « read less
Developed three upgrade options and ultimate design of the c...read more »hosen options for the Gibraltar Pump Station. Also conducted field investigation and coordination with the electric utility for shutdowns to determine actual capacity of the existing switchgear and utility feeder bussing. Design work required to provide for future additions. « read less