The Holly Theatre was constructed in Medford in 1930 and was...read more » an icon of Medford's downtown district. This stately theater brought families downtown to see the latest films and served as a catalyst for business activity. With an original seating capacity of 1,200, the Holly operated until 1986 when changes in the motion picture industry caused many single-screen movie houses to close. The Holly Theatre building has been recognized as having both national and statewide historic significance and is listed on the National Register of Historic Places. The Holly Theatre was built by noted Medford architect Frank C. Clark at an original cost of $100,000 in a Spanish Colonial Revival style. ArcSine Engineering was hired to provide electrical, mechanical, plumbing, and lighting design services for the restoration of this cherished landmark. « read less
Biggs-Gridley Memorial Hospital Chiller Project Job 1218.00
Electrical design for installation of a new 60-ton air-co...read more »oled chiller at the Biggs-Gridley Memorial Hospital located in Gridley, California. « read less
Provided a review and clarification of fire alarm design-bui...read more »ld quotes for the St. Mary's School of Performance and Athletic Center. Provided coordination between multiple contractors to equalize work and quotes. « read less
First United Methodist Church - Lighting Job 1233.00
The First United Methodist Church (FUMC), located ...read more »in Redding, California, is modernizing portions of their existing building including the sanctuary. Modernization efforts include expanding the stage area, and upgrading sound, electrical power, and both house and theatrical lighting systems. « read less
Napa Sanitation District - Aerator Addition Job 1266.00
Planning and design of aeration system for 100 acre treatmen...read more »t pond system. Included integration with plant control system. Electrical loads were separated by 12-KV overhead distribution and 12-KV to 480-volt unit substation sized for this project as well as permanent sludge dredge and conveyance system. « read less
Engineering design of electric power to and from new powe...read more »r supplies for a fiber glass manufacturing plant located in Willows, California. Mechanical engineering: determined cooling tower capacity and design of piping to supply two new power supplies and exisiting heat loads. « read less
Programming, configuration, and integration of telemetry ...read more »equipment and control system components for essential elements of the Garberville Sanitary District's water acquisition, treatment, and distribution system in Garberville, California.
Project consists of three sites:
Raw water pumping station (complete rehabilitation)
Water treatment plant (new facility)
Water storage tank and booster pumping station (rehabilitation)
Project elements include:
150 MHz, licensed radio telemetry
PLC control of each site
Operator interface at water treatment plant for for system control
« read less
Construction management and observation, and engineering ser...read more »vices during construction for a $4.5 million upgrade to the Dublin San Ramon Service District's (DSRSD) Field Operations Division Supervisory Control and Data Acquisition (SCADA) System covering 47 remote sites. On-site construction management over 80-week project duration, including site inspections, contractor coordination, scheduling, permit coordination, and related construction management services. « read less
Designs for replacement of aging electrical and motor c...read more »ontrols. Added manual transfer switch and receptacle for connection of a portable generator. « read less
Electrical and fire alarm system design for the Humboldt Cou...read more »nty Office of Education, Sequoia Conference Center located in Eureka, California. « read less
Bear River Band of Rhonerville Rancheria - Tish-Non Health and Wellness Center Job 1351.00
Provided MEP design for the new 35,500-square-foot Bear...read more » River Tish-Non Health and Wellness Center in Loleta, California. Work included power distribution, rooftop photovoltaic system, and lighting design. « read less
California State Parks - Donner Memorial - Construction Admin Services Job 1369.03
Provided system control services with as-built documentation...read more » for existing systems and integration of new improvements to the lighting and control systems, and electrical distribution system for the Visitor's Center and exterior monument area. « read less
NIC Industries Polymer Design Assistance Job 1372.00
ArcSine provided services to evaluate, design, and assist...read more »e with supervision of construction and commissioning of a proprietary production facility in White City, Oregon.
Project goals included:
Define criteria
Develop a pilot continuous-process manufacturing system
Refine and scale-up to construct continuous-process manufacturing facilities
Recover ammonia to the extent practical/desired
Identify patent opportunities, and develop documentation in support of them
« read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.