THis project included updating eleven educational spaces at ...read more »Mt. Shasta High School to modernize their facility. Mechanical, elecltrical, and plumbing includes new power distribution for five of the spaces, relocation of condensing units, new plumbing and modification, new HVAC, and complete MEP redesign for the boy's and girl's bathrooms, locker rooms, and shower facilities in the gym. « read less
On-call Engineering Support for the Central Contra Costa Cou...read more »nty Sanitary District, in Martinez, California, to provide electrical/instrumentation and controls/mechanical consultation for various pump station and treatment plan projects as identified by the District on an as-needed basis. « read less
Phoenix High Schooll Tennis Courts Lighting Job 2331.00
Power distribution modification and lighting design fora new...read more » 26,000 square-foot tennis court complex at the Phoenix High School in Phoenix, Oregon. « read less
Power distribution, lighting, and fire alarm system modifcat...read more »ions to accompdate the removal and replacement of the Dunsmuir High School Gymnasiium roof structure, which sustained damage during heavy snowfall in February 2023. « read less
This project included power distribution, HVAC, lightin...read more »g, and plumbing design for the new contruction of a 4,000-square-foot Veterans Hall in Garberville, California. Project included solar power, solar water heating, fire sprinkler system, a small commercial kitchen, restrooms, and a meerting hall with audio/video systems. « read less
Central Curry School District - Gold Beach and Riley Creek High Schools Job 2343.00
Power distribution, lighting, HVAC and plumbing modification...read more »s to accomodate renovations to the Gold Beach and Riley Creek High Schools in Gold Beach, Oregon. « read less
Nuclear Medicine Associates - X-Ray Machine Replacement Job 2351.00
Power distribution design for an approximate 740-square-foot...read more » remodel at the Nuclear Medicine Associates building, in Redding, California. The remodel was necessary to accomodate a new, larger X-Ray machine, which is replacing an existing X-Ray machine that has reached the end of its usefull life. Contract documents were prepared which will be suitable for plan check and obtaining comptetitive bids. « read less
Power distribution, lighting, HVAC, and plumbing design for ...read more »the new outdoor learning center of the Children's Museum of Southern Oregon. The project includes an outdoor classroom area, restrooms, and a storage area.
« read less
Southern Oregon University - Central Hall Basement Job 2354.00
The project includes power distribution, lighting, HVAC, and...read more » plumbing design for the basement remodel of Central Hall on the campus of Southern Oregon University in Ashland, Oregon. Also included: improvement design to an existing 14,000 square-foot basement to accomodate one classroom, 29 offices, two bathrooms, and 24 micellaneous rooms for the ROTC, USEM, DR, and UCAM. « read less
Southern Oregon University - Softball Complex Upgrades Job 2403.00
Design of power distribution system modification, site light...read more »ing, new HVAC systems, and new plumbing systems to support the replacement of the Southern Oregon University softball complex. The project includes multiple new buildings, including restrooms, concessions, a press box, gathering area, and more. « read less
The project includes power distribution, lighting, HVAC, and...read more » plumbing design for the renovation of the BLM office in Susanville, California. The project includes field investigation activities, selective salvagin of existing equipment, and selective demolition activities within the renovation area. The project also includes design to support the installation of a new separate warehouse building on the project site. « read less
Power distribution and controls associated with fountain pum...read more »p replacement at the Turtle Bay Arboretum Drive Complex, located in Redding, California. « read less
Power distribution design consisting of 12 service entrances...read more » to support snowmaking activities. Included power distribution to 101 snowmaking electrical pedestals and 46 light poles placed throughout the ski area. Designed power distribution and control interfaces for the water supply system consisting of two wells, a 3-million-gallon reservoir, and a pumping station. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.