As part of design of new and upgraded facilities, designed n...read more »ew programmable controls. Projects include the following: • Martinez Pumping Station, Orinda Crossroads Pumping Station,Moraga Pumping Station, San Ramon Pumping Station, Lower Orinda Pumping Station « read less
McConnell Foundation - Maintenance Facility Job 9811.00
Designed electrical, lighting, and energy management and com...read more »puting systems for an 18,500-square-foot private corporation maintenance facility. This project integrated with existing Foundation buildings, and accordingly included the following peripheral systems: Fiber optic and copper links with the Foundation, facility-wide computer networking video, card-key access control, entry gate control systems, fire and intrusion alarming, full HVAC and lighting control with remote control provisions. Included vehicle maintenance and fueling. « read less
EBMUD - Point Isabel Treatment Plant - Pumping Station Job 9823.00
Designed new programmable controls and modifications to, and...read more » interfaces with, the District’s distributed control system (DCS) as part of design of new and upgraded facilities. Projects include the following: Point Isabel Treatment Plant/Pump Station “N” consolidation, Pumping Station “Q”, Pumping Station “G”, and Operations Building upgrade. « read less
As part of design of new and upgraded facilities, designed n...read more »ew programmable controls. Projects include the following: • Martinez Pumping Station, Orinda Crossroads Pumping Station,Moraga Pumping Station, San Ramon Pumping Station, Lower Orinda Pumping Station « read less
City of Brentwood - Water and Wastewater Facilities Job 9913.00
Design of electrical and control systems for new 10-mgd, $39...read more »-million facility, with complete provisions to support later plant upgrades. Included dual-redundant programmable control systems and plant-wide fiber-optic networks in self-healing configuration. « read less
Prepared a master plan for, and then designed, a 23-site SCA...read more »DA system. The project included in-depth planning for station primary and backup controls, supervisory monitoring and controls, communications, integration with the main wastewater treatment plant, system implementation, and evaluation of personnel required to support the system. « read less
As part of design of new and upgraded facilities, designed n...read more »ew programmable controls. Projects include the following: • Martinez Pumping Station, Orinda Crossroads Pumping Station,Moraga Pumping Station, San Ramon Pumping Station, Lower Orinda Pumping Station « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.