Electrical and lighting design for new floating complex incl...read more »uding fueling facilities, a retail store, and houseboat service bays. « read less
As part of design of new and upgraded facilities, designed n...read more »ew programmable controls. Projects include the following: • Martinez Pumping Station, Orinda Crossroads Pumping Station,Moraga Pumping Station, San Ramon Pumping Station, Lower Orinda Pumping Station « read less
ArcSine Engineering was the lead consultant on evaluation an...read more »d design of replacement electrical systems for the 700-million-gallons-per-day influent pumping station at the Sacramento Regional Wastewater Treatment Plant. The project included a new 32 MVA substation and 4kV motor control centers, feeding 17,500 horsepower of load. Systems are fully redundant and serviceable. New equipment is housed in a 4,050-square-foot building, fully integrated with site plumbing, HVAC, communications, fire protection, and alarm systems. Building and landscape architecture complement surrounding facilities. The design also included use-change of the existing 1,400-square-foot switchgear room to provide office infrastructure. « read less
Designed electrical and instrumentation/control systems for ...read more »225-hp pumping station with two standby generators. Included communications interface with District’s SCADA system. « read less
Lighting and power distribution design for the remodel of a ...read more »medical imaging facility to accept a new Positron Emission Tomography Scanner. Work included analyzing manufacturers’ requirements to adapt equipment for remote positioning of key components and design for interconnecting wire and conduit. « read less
Power distribution and lighting design for a 10,000-square-f...read more »oot maintenance building and four administrative buildings (totaling 6,000 square feet). Project included design of a generator and transfer switch. « read less
Preliminary design and utility coordination for 12kV service...read more » and distribution throughout a rural Northern California rock quarry and asphalt plant. Prepared a report including estimated costs of initial installations of commercial power and onsite generation, along with supporting documentation; i.e., production/energy usage projection, adjustment to PG&E revenue allowance, PG&E correspondence, PG&E billing rates, Owner-installed equipment, onsite generation initial cost, onsite generation operating cost, and engine emissions. Provided one-line diagram. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.