Prepared a master plan for, and then designed, a 23-site SCA...read more »DA system. The project included in-depth planning for station primary and backup controls, supervisory monitoring and controls, communications, integration with the main wastewater treatment plant, system implementation, and evaluation of personnel required to support the system. « read less
California State Parks - McArthur-Burney Falls State Park Amphitheater Job SP2
The McArthur-Burney Falls Memorial State Park is located in ...read more »the midst of the Cascade and Modoc mountain regions, surrounded by forest, streams, and Lake Briton. Its center is marked by the magnificent Burney Falls. ArcSine was chosen to design the lighting for the new park amphitheater. The project consisted of a design with programmed lighting controls and multimedia capabilities. « read less
California State Parks - Shasta Courthouse Museum Job SP3
The Shasta Courthouse structure was constructed in 1855. &nb...read more »sp;In 1861 it was remodeled into offices, a courtroom, and a downstairs jail. It remained the courthouse and jail until Shasta County built a bigger courthouse in Redding. ArcSine was contracted to provide power distribution renovation and lighting design for this historical building and museum. The design included a facility-wide networked control system, including automatic dimming. For changing and future exhibits, a felxible lighting system was designed. Fiber optic light sources were used to provide illumination of selected artifacts. « read less
California State Parks - Weaverville Joss House Job SP4
The Weaverville Joss House, a Taoist Temple built in 1874, i...read more »s considered the oldest, continuously used original Chinese house of worship in California. ArcSine designed an upgrade for power distribution and lighting for the Joss House. The lighting system provided for proper lighting levels, lamp and filter selection, and occupancy sensors with automatic dimming. Fiber optic light sources were used to provide illumination of selected artifacts. The design included provisions for future upgrade to a facility-wide lighting controller, as budget allows.
« read less
Electrical and lighting design for new floating complex incl...read more »uding fueling facilities, a retail store, and houseboat service bays. « read less
Prepared a master plan for, and then designed, a 23-site SCA...read more »DA system. The project included in-depth planning for station primary and backup controls, supervisory monitoring and controls, communications, integration with the main wastewater treatment plant, system implementation, and evaluation of personnel required to support the system. « read less
As part of design of new and upgraded facilities, designed n...read more »ew programmable controls. Projects include the following: • Martinez Pumping Station, Orinda Crossroads Pumping Station,Moraga Pumping Station, San Ramon Pumping Station, Lower Orinda Pumping Station « read less
Electrical and lighting design for the restoration of a 1,00...read more »0-seat, 1930’s era, art deco style movie house/theatre. ArcSine’s design for this challenging and rewarding project included extensive field investigation to understand the original electrical system and the changes that had been made over the years; electrical demolition work by our staff to ensure that selected raceways could be reused; careful, detailed planning of new electrical system components to minimize impact to the building’s original construction; period lighting design; and programming and startup of the building lighting control system. Included sound and theatrical lighting systems. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.