426 "A" Street - Ashland - LEED Gold Certification Job 1174.00
New construction of a two-story, 4,000-square-foot commercia...read more »l, retail, and residential building. LEED Gold Certification including light pollution reduction, 20% reduction in water use, innovative wastewater technologies, minimum energy performance, refrigerant management, optimized energy performance, on-site renewable energy, enhanced refrigerator management, and measurement and verification. « read less
The Holly Theatre was constructed in Medford in 1930 and was...read more » an icon of Medford's downtown district. This stately theater brought families downtown to see the latest films and served as a catalyst for business activity. With an original seating capacity of 1,200, the Holly operated until 1986 when changes in the motion picture industry caused many single-screen movie houses to close. The Holly Theatre building has been recognized as having both national and statewide historic significance and is listed on the National Register of Historic Places. The Holly Theatre was built by noted Medford architect Frank C. Clark at an original cost of $100,000 in a Spanish Colonial Revival style. ArcSine Engineering was hired to provide electrical, mechanical, plumbing, and lighting design services for the restoration of this cherished landmark. « read less
Provided a review and clarification of fire alarm design-bui...read more »ld quotes for the St. Mary's School of Performance and Athletic Center. Provided coordination between multiple contractors to equalize work and quotes. « read less
NASA-Ames Research Center - TP3 Arc Heater Job 1231.00
The Ames TP3 heater is an Arc heater which was relocated fro...read more »m Johnson Space Center, Houston, Texas to the Arc Jet complex, Aerodynamic Heating Facility (AHF) test bay at Ames Research Center in Moffett Field, California. This facility has been the R&D testing facility for tiles which have been used on space re-entry vehicles (shuttle).
ArcSine Engineering designed power distribution, motor controls, and hardwired safety relay logic for the Argon, nitrogen, oxygen, and CO2 gas systems, ventilation and exhaust systems of the test bay, test chamber, and basement area. ArcSine also performed all associated programming of the PLC and HMI screen development. « read less
New construction, mixed-use building in downtown Ashland, Or...read more »egon.
1st floor: Restaurant and wine tasting
2nd floor: Six hotel units
3rd floor: Six condominium units
« read less
Electrical, lighting, mechanical, and plumbing design for th...read more »e Neighborhood Church of Redding, located in Redding, California. The project consists of one Worship Building with infracstructure and provisions for future buildout. The Worship Building is approximately 25,000 square feet, and includs space for a Sanctuary area as well as several rooms for support activities. « read less
Electrical and lighting design for the Karuk Tribal Wellness...read more » Center located in Yreka, California. The building in an 18,000-square-foot facility which will house a gymnasium large enough for a regulation basketball court, a men's and women's locker room, an exercise room, a commercial kitchen, and office spaces. The building is to promote sustainability through energy efficient, environmentally friendly, and universally accessible design which is cost effective. « read less
Engineering design of electric power to and from new powe...read more »r supplies for a fiber glass manufacturing plant located in Willows, California. Mechanical engineering: determined cooling tower capacity and design of piping to supply two new power supplies and exisiting heat loads. « read less
Northern California & Oregon Engineering Company serving Redding, the Bay Area, and the surrounding Northern California area, as well as Medford, Rogue Valley, Willamette Valley, Southern Oregon, Central Oregon, Nevada, Washington, Idaho, Utah, and Arizona.